The replacement of 42 anchor bolts in a diesel engine on a concrete foundation is not an easy job, however, with these steps, you can have a good idea of how the Alphatec Engineering SL team did it:
1- Diamond Core Drilling
2- Diamond Wire Cut
3- Take out the concrete blocks
4- Replacement of anchor bolts for new ones
5- New rebar & concrete
6- Regrout with green epoxy grout Alphatec®️ 800

The job was part of the foundation repair of a Mitsubishi–MAN diesel engine, type 18V52/55B, that drives a brushless alternator of 13 MW capacity, installed in 1989.

Even though it was not the oldest of the units at the site, this one developed vibration problems, forcing a reduction in engine speed to avoid major damage, and resulting in decreased efficiency.

The result of this 68-day intervention was the vibration reduction and the possibility of full-power operation for many years to come.

Project data

Client

CUC (Commonwealth Utility Corporation)

Final user

Saipan Main Power Plant

Project

Replacement of 42 anchor bolts in a Mitsubishi–MAN diesel engine 18V52/55B

Equipment

Mitsubishi–MAN diesel engine 18V52/55B that drives a brushless alternator of 13 MW capacity

Work period

August – September 2016

Location

Lower Base, Saipan, Northern Marianas Island