{"id":6485,"date":"2023-09-04T06:28:33","date_gmt":"2023-09-04T04:28:33","guid":{"rendered":"https:\/\/alphatec-engineering.com\/installation-de-la-fondation-dune-pompe-a-eau-etude-de-cas\/"},"modified":"2023-09-04T06:28:33","modified_gmt":"2023-09-04T04:28:33","slug":"installation-de-la-fondation-dune-pompe-a-eau-etude-de-cas","status":"publish","type":"post","link":"https:\/\/alphatec-engineering.com\/fr\/installation-de-la-fondation-dune-pompe-a-eau-etude-de-cas\/","title":{"rendered":"Installation de la fondation d&rsquo;une pompe \u00e0 eau : \u00c9tude de cas<br>"},"content":{"rendered":"<p><b>Nom du projet : <\/b><span style=\"font-weight: 400;\">Installation d&rsquo;une pompe \u00e0 eau<\/span> <\/p>\n<p><b>Date de r\u00e9alisation : <\/b><span style=\"font-weight: 400;\">Pompe A &#8211; 04\/11\/2022, Pompe B &#8211; 17\/03\/2023<\/span><\/p>\n<p><b>Lieu : <\/b><span style=\"font-weight: 400;\">Royaume-Uni<\/span><\/p>\n<p><b>Type de projet : <\/b><span style=\"font-weight: 400;\">Installation sur fondation existante<\/span><\/p>\n<p><b>Secteur : <\/b><span style=\"font-weight: 400;\">P\u00e9trole et gaz<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">Pr\u00e9sentation du projet<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Ce projet, men\u00e9 avec succ\u00e8s par Alphatec Engineering, consistait \u00e0 remplacer deux pompes obsol\u00e8tes datant des ann\u00e9es 1970 par des mod\u00e8les modernes et plus performants fournis par <a href=\"https:\/\/www.flowserve.com\/en\/\" target=\"_blank\" rel=\"noopener\">Flowserve<\/a>.  <\/span><\/p>\n<p><span style=\"font-weight: 400;\">L&rsquo;installation s&rsquo;est d\u00e9roul\u00e9e en deux phases, avec la pompe A mise en service en novembre 2022 et la pompe B en mars 2023. L&rsquo;objectif principal \u00e9tait d&rsquo;augmenter les capacit\u00e9s de traitement de l&rsquo;eau de la raffinerie tout en am\u00e9liorant son rendement op\u00e9rationnel global. <\/span><\/p>\n<h3><span style=\"font-weight: 400;\">D\u00e9fis impr\u00e9vus<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Lors de l&rsquo;installation, Alphatec Engineering s&rsquo;est heurt\u00e9e \u00e0 plusieurs d\u00e9fis impr\u00e9vus. La premi\u00e8re difficult\u00e9 a surgi lorsqu&rsquo;il s&rsquo;est av\u00e9r\u00e9 que le fournisseur de la pompe avait peint l&rsquo;int\u00e9gralit\u00e9 du b\u00e2ti, n\u00e9gligeant de d\u00e9caper la face inf\u00e9rieure conform\u00e9ment aux exigences de la norme API RP 686.  <\/span><\/p>\n<div id=\"attachment_1460\" style=\"width: 310px\" class=\"wp-caption alignnone\"><img decoding=\"async\" aria-describedby=\"caption-attachment-1460\" class=\"wp-image-1460 size-medium\" src=\"https:\/\/alphatec-engineering.com\/wp-content\/uploads\/2023\/09\/117172744_3289712527920533_7498548236544952150_n-300x298.jpg\" alt=\"Normes API\" width=\"300\" height=\"298\" srcset=\"https:\/\/alphatec-engineering.com\/wp-content\/uploads\/2023\/09\/117172744_3289712527920533_7498548236544952150_n-300x298.jpg 300w, https:\/\/alphatec-engineering.com\/wp-content\/uploads\/2023\/09\/117172744_3289712527920533_7498548236544952150_n-150x150.jpg 150w, https:\/\/alphatec-engineering.com\/wp-content\/uploads\/2023\/09\/117172744_3289712527920533_7498548236544952150_n-140x140.jpg 140w, https:\/\/alphatec-engineering.com\/wp-content\/uploads\/2023\/09\/117172744_3289712527920533_7498548236544952150_n-100x100.jpg 100w, https:\/\/alphatec-engineering.com\/wp-content\/uploads\/2023\/09\/117172744_3289712527920533_7498548236544952150_n.jpg 451w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><p id=\"caption-attachment-1460\" class=\"wp-caption-text\">Source de l&rsquo;image : api.org<\/p><\/div>\n<p><span style=\"font-weight: 400;\">Par ailleurs, les angles du b\u00e2ti n&rsquo;avaient pas \u00e9t\u00e9 arrondis selon un rayon de 25,4 mm (1 pouce), risquant ainsi de cr\u00e9er des concentrations de contraintes. De surcro\u00eet, les conditions m\u00e9t\u00e9orologiques d\u00e9favorables de novembre ont \u00e9galement compliqu\u00e9 la t\u00e2che de l&rsquo;\u00e9quipe d&rsquo;installation. <\/span><\/p>\n<h3><span style=\"font-weight: 400;\">R\u00e9solution des difficult\u00e9s<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Pour surmonter ces obstacles, Alphatec Engineering a pris des mesures proactives. L&rsquo;\u00e9quipe a d\u00e9cap\u00e9 la peinture de la face inf\u00e9rieure du b\u00e2ti \u00e0 l&rsquo;aide d&rsquo;une meuleuse d&rsquo;angle \u00e9quip\u00e9e d&rsquo;un disque \u00e0 lamelles, restaurant ainsi la pleine conformit\u00e9 avec les exigences de la norme API RP 686. <\/span><\/p>\n<p><span style=\"font-weight: 400;\"> Les angles ont \u00e9galement \u00e9t\u00e9 arrondis afin d&rsquo;\u00e9liminer les concentrations de contraintes potentielles, renfor\u00e7ant de ce fait l&rsquo;int\u00e9grit\u00e9 structurelle de l&rsquo;installation. <\/span><\/p>\n<p><span style=\"font-weight: 400;\">Enfin, pour faire face aux intemp\u00e9ries de novembre, l&rsquo;\u00e9quipe a mis en place un \u00e9chafaudage et un b\u00e2chage de protection pour se pr\u00e9munir de la pluie et assurer la continuit\u00e9 du chantier.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">Enseignements tir\u00e9s<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Ce projet d&rsquo;installation a \u00e9t\u00e9 riche d&rsquo;enseignements, tant pour le client final que pour le fournisseur des pompes. Les le\u00e7ons tir\u00e9es de la premi\u00e8re phase ont permis d&rsquo;optimiser consid\u00e9rablement la seconde.  <\/span><\/p>\n<p><span style=\"font-weight: 400;\">Ainsi, pour l&rsquo;installation de la pompe B, le b\u00e2ti a \u00e9t\u00e9 livr\u00e9 avec sa face inf\u00e9rieure non peinte et ses angles correctement arrondis d\u00e8s le d\u00e9part, d\u00e9montrant l&rsquo;int\u00e9r\u00eat de capitaliser sur l&rsquo;exp\u00e9rience pour am\u00e9liorer les projets futurs.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">Succ\u00e8s et r\u00e9alisations<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Le projet a \u00e9t\u00e9 men\u00e9 \u00e0 bien dans le respect des d\u00e9lais, les deux pompes ayant \u00e9t\u00e9 install\u00e9es conform\u00e9ment au planning. Le client a exprim\u00e9 sa pleine satisfaction quant aux r\u00e9sultats.  <\/span><\/p>\n<p><span style=\"font-weight: 400;\">Il s&rsquo;agissait de sa premi\u00e8re exp\u00e9rience avec le coulis \u00e9poxy <a href=\"https:\/\/alphatec-engineering.com\/products\/at800-alphatec-800-high-performance-epoxy-grout\/\">Alphatec 800<\/a>. Ce produit \u00e9t\u00e9 jug\u00e9 plus \u00e9conomique et plus facile \u00e0 mettre en \u0153uvre, notamment en raison de sa simplicit\u00e9 d&#8217;emploi sans contrainte de temp\u00e9rature et de l&rsquo;absence de n\u00e9cessit\u00e9 de chauffage pour assurer sa prise. <\/span><\/p>\n<div id=\"attachment_1461\" style=\"width: 418px\" class=\"wp-caption alignnone\"><img decoding=\"async\" aria-describedby=\"caption-attachment-1461\" class=\"wp-image-1461\" src=\"https:\/\/alphatec-engineering.com\/wp-content\/uploads\/2023\/09\/resin-grout-AT-800-industrial-grouting-300x169.jpg\" alt=\"AT 800\" width=\"408\" height=\"230\" srcset=\"https:\/\/alphatec-engineering.com\/wp-content\/uploads\/2023\/09\/resin-grout-AT-800-industrial-grouting-300x169.jpg 300w, https:\/\/alphatec-engineering.com\/wp-content\/uploads\/2023\/09\/resin-grout-AT-800-industrial-grouting-1024x576.jpg 1024w, https:\/\/alphatec-engineering.com\/wp-content\/uploads\/2023\/09\/resin-grout-AT-800-industrial-grouting-768x432.jpg 768w, https:\/\/alphatec-engineering.com\/wp-content\/uploads\/2023\/09\/resin-grout-AT-800-industrial-grouting.jpg 1536w\" sizes=\"(max-width: 408px) 100vw, 408px\" \/><p id=\"caption-attachment-1461\" class=\"wp-caption-text\">L&rsquo;Alphatec 800 en place<\/p><\/div>\n<p><span style=\"font-weight: 400;\">La r\u00e9ussite de l&rsquo;installation de ces nouvelles pompes a permis \u00e0 la raffinerie d&rsquo;am\u00e9liorer ses capacit\u00e9s de traitement de l&rsquo;eau et d&rsquo;accro\u00eetre son rendement op\u00e9rationnel.<\/span><\/p>\n<h3><span style=\"font-weight: 400;\">Impact environnemental<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Au-del\u00e0 du gain en rendement op\u00e9rationnel, ce projet a \u00e9galement marqu\u00e9 un engagement envers la durabilit\u00e9 environnementale. L&rsquo;un des aspects cl\u00e9s de cet impact positif a \u00e9t\u00e9 l&rsquo;utilisation strat\u00e9gique du coulis \u00e9poxy pour l&rsquo;installation des pompes. <\/span><\/p>\n<p><span style=\"font-weight: 400;\">Compar\u00e9 au coulis cimentaire traditionnel, qui exige souvent des reprises de scellement au fil du temps, le coulis \u00e9poxy offre une solution de qualit\u00e9 sup\u00e9rieure et bien plus durable. En choisissant cette technologie, Alphatec Engineering a garanti une installation \u00ab bonne du premier coup \u00bb, r\u00e9duisant ainsi de mani\u00e8re significative le besoin d&rsquo;interventions de maintenance futures. Cette diminution des reprises de scellement permet non seulement d&rsquo;\u00e9conomiser des ressources, mais aussi de minimiser la production de d\u00e9chets li\u00e9s aux activit\u00e9s de r\u00e9paration et d&rsquo;entretien.  <\/span><\/p>\n<p><span style=\"font-weight: 400;\">De plus, la durabilit\u00e9 et la r\u00e9sistance \u00e0 la corrosion chimique exceptionnelles du coulis \u00e9poxy en font un choix id\u00e9al pour les environnements industriels agressifs, tels que celui du secteur p\u00e9trolier et gazier. La dur\u00e9e de vie prolong\u00e9e du coulis mis en \u0153uvre sur cette installation contribue \u00e0 r\u00e9duire l&#8217;empreinte carbone en diminuant la fr\u00e9quence des remplacements et, par cons\u00e9quent, les impacts li\u00e9s \u00e0 la fabrication et au transport des mat\u00e9riaux. <\/span><\/p>\n<p><span style=\"font-weight: 400;\">Enfin, la parfaite plan\u00e9it\u00e9 et l&rsquo;alignement pr\u00e9cis obtenus gr\u00e2ce au coulis \u00e9poxy optimisent le rendement de la pompe, ce qui se traduit par une consommation d&rsquo;\u00e9nergie r\u00e9duite en phase d&rsquo;exploitation. Cette efficacit\u00e9 \u00e9nerg\u00e9tique entra\u00eene une diminution des \u00e9missions de gaz \u00e0 effet de serre, en phase avec les efforts globaux de lutte contre le changement climatique. <\/span><\/p>\n<h3><span style=\"font-weight: 400;\">Conclusion<\/span><\/h3>\n<p><span style=\"font-weight: 400;\">En conclusion, la r\u00e9ussite de ce projet d&rsquo;installation met en lumi\u00e8re l&rsquo;expertise d&rsquo;Alphatec Engineering dans la gestion de chantiers complexes au sein de l&rsquo;industrie p\u00e9troli\u00e8re et gazi\u00e8re.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">En relevant avec efficacit\u00e9 les d\u00e9fis impr\u00e9vus et en mettant en \u0153uvre des mesures proactives, l&rsquo;\u00e9quipe a d\u00e9montr\u00e9 sa capacit\u00e9 d&rsquo;adaptation et son engagement \u00e0 fournir des r\u00e9sultats de la plus haute qualit\u00e9. <\/span><\/p>\n<p><span style=\"font-weight: 400;\">L&rsquo;impact environnemental positif du projet, obtenu gr\u00e2ce \u00e0 l&rsquo;utilisation du coulis \u00e9poxy, souligne par ailleurs l&rsquo;engagement d&rsquo;Alphatec Engineering en faveur de la durabilit\u00e9 et des pratiques d&rsquo;ing\u00e9nierie responsables. <\/span><\/p>\n<p><span style=\"font-weight: 400;\">Cette installation a \u00e9t\u00e9 une v\u00e9ritable opportunit\u00e9 d&rsquo;apprentissage pour le client comme pour le fournisseur. \u00c0 travers ce projet, Alphatec Engineering continue de d\u00e9finir de nouveaux standards en mati\u00e8re d&rsquo;efficacit\u00e9, de fiabilit\u00e9 et de satisfaction client pour l&rsquo;avenir. Pour d\u00e9couvrir d&rsquo;autres livres blancs et \u00e9tudes de cas, <a href=\"https:\/\/alphatec-engineering.com\/success-cases\/\">consultez nos r\u00e9alisations<\/a>. <\/span><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nom du projet : Installation d&rsquo;une pompe \u00e0 eau Date de r\u00e9alisation : Pompe A &#8211; 04\/11\/2022, Pompe B &#8211; 17\/03\/2023 Lieu : Royaume-Uni Type de projet : Installation sur&#8230;<\/p>\n","protected":false},"author":2,"featured_media":6489,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-6485","post","type-post","status-publish","format-standard","has-post-thumbnail"],"_links":{"self":[{"href":"https:\/\/alphatec-engineering.com\/fr\/wp-json\/wp\/v2\/posts\/6485","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alphatec-engineering.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alphatec-engineering.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alphatec-engineering.com\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/alphatec-engineering.com\/fr\/wp-json\/wp\/v2\/comments?post=6485"}],"version-history":[{"count":0,"href":"https:\/\/alphatec-engineering.com\/fr\/wp-json\/wp\/v2\/posts\/6485\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/alphatec-engineering.com\/fr\/wp-json\/wp\/v2\/media\/6489"}],"wp:attachment":[{"href":"https:\/\/alphatec-engineering.com\/fr\/wp-json\/wp\/v2\/media?parent=6485"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alphatec-engineering.com\/fr\/wp-json\/wp\/v2\/categories?post=6485"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alphatec-engineering.com\/fr\/wp-json\/wp\/v2\/tags?post=6485"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}